CSI Facilities

Facility-1- Alexandria

Fully equipped fabrication facility located at Bourg Al-Arab, 4th industrial zone, Block No. 4, Piece 8, 9, 10, 11, 19, 20, 21& 22 with a total area of (≅32,000.00 m2).

  • Maximum capacity of piping and steel structure elements is ≅ 400 ton per month.
  • 7,336.00 m2 of covered fabrication and assembly place.
  • 2,500.00 m2 Sandblasting and painting area.
  • 5,000 Warehouse area (material, tools and equipment)
  • 1,600 Administration Building.

Facility-2- Alexandria

Second fabrication yard located at El-Ameria, El-Kafoury, Bourg El-Arab Road with a total area of 4,000.00 m2, and have a capacity of 150 ton per month.

  • Now under rehabilitation.

Facility-3-Cairo

Katamia, Cairo, fabrication yard under preparation with a total area of 4,800 m2.