EMG /El-Arish Gas Compression Station.
13 months
KTI
230,000.00 Mhrs.
Electromechanical installation Works & 26” export gas pipeline, the contracted work consists of the following:
– Mechanical works.
– Electrical works.
– Instruments installation works.
– Insulation works.
– Painting works.
– Pre-commissioning activity.
– Works for the export gas pipeline from compressing station to sea line, including civil works, unpaved service road, grading of right way and pipeline installation.
– Works for the 26” interconnecting pipeline between GASCO facilities and EMG compressing station length about 210 m, (civil works and installation).
Chipsy Food Industry
3 months
Chipsy
Supply, fabrication and erection of the following:
a. Conveyor platform
b. WM Local Built Items
c. New line for food processing
d. Seasoning Machine Line 1,2 & 3
(4) Filter House Intake System
5 months
LoTecInc – USA
around 100 ton
Supply, fabrication, painting and insulation of No. 4 filter house intake systems, including packing, transportation and shipment to Ghana site.
ASSPC
12 months
T.R.
35,000 Mhrs
Sand Blasting & Painting
Naphtha reformer complex
24 months
Technip – Italy.
525,000 painting Mhrs out of 900,000 total Mhrs
Equipment erection, painting, insulation, electrical and instrumentation works.
Isomerization Plant
6 months
LurgiResta
35,000Mhrs / 10,000 M2
Chlorine Liquefaction Plant
12 months
Technifrigo.
35,000Mhrs / 10,000 M2
Platform Revamping.
18 months
Egypt Gas
350,000 Mhrs. / 100,000 M2.
Sand blasting & Painting Inspection.
SILPA 140 Air Separation Unit
11 months
Air Liquide
250,000.00 Mhrs.
Civil, Electromechanical, Painting and insulation works.
CSI scope including
o Civil works.
o Electrical and instrument work supply and installation.
o Supply and installation of the firefighting, fire alarm, paging, telecommunication and HVAC systems.
o Supply and installation of piping and steel structure.
o Insulation and painting.
Lube Oil Expansion
10 months
F.W.F / Cgi.
180,000 Mhrs / 45,000M2
Hot and Cold insulation works