Project Profile
Project Name :

EMG /El-Arish Gas Compression Station.

Duration :

13 months

Client :

KTI

Work Volume :

230,000.00 Mhrs.

Project Description :

Electromechanical installation Works & 26” export gas pipeline, the contracted work consists of the following:
– Mechanical works.
– Electrical works.
– Instruments installation works.
– Insulation works.
– Painting works.
– Pre-commissioning activity.
– Works for the export gas pipeline from compressing station to sea line, including civil works, unpaved service road, grading of right way and pipeline installation.
– Works for the 26” interconnecting pipeline between GASCO facilities and EMG compressing station length about 210 m, (civil works and installation).

Project Name :

Chipsy Food Industry

Duration :

3 months

Client :

Chipsy

Project Description :

Supply, fabrication and erection of the following:
a. Conveyor platform
b. WM Local Built Items
c. New line for food processing
d. Seasoning Machine Line 1,2 & 3

Project Name :

(4) Filter House Intake System

Duration :

5 months

Client :

LoTecInc – USA

Work Volume :

around 100 ton

Project Description :

Supply, fabrication, painting and insulation of No. 4 filter house intake systems, including packing, transportation and shipment to Ghana site.

Project Name :

ASSPC

Duration :

12 months

Client :

T.R.

Work Volume :

35,000 Mhrs

Project Description :

Sand Blasting & Painting

Project Name :

Naphtha reformer complex

Duration :

24 months

Client :

Technip – Italy.

Work Volume :

525,000 painting Mhrs out of 900,000 total Mhrs

Project Description :

Equipment erection, painting, insulation, electrical and instrumentation works.

Project Name :

Isomerization Plant

Duration :

6 months

Client :

LurgiResta

Work Volume :

35,000Mhrs / 10,000 M2

Project Name :

Chlorine Liquefaction Plant

Duration :

12 months

Client :

Technifrigo.

Work Volume :

35,000Mhrs / 10,000 M2

Project Name :

Platform Revamping.

Duration :

18 months

Client :

Egypt Gas

Work Volume :

350,000 Mhrs. / 100,000 M2.

Project Description :

Sand blasting & Painting Inspection.

Project Name :

SILPA 140 Air Separation Unit

Duration :

11 months

Client :

Air Liquide

Work Volume :

250,000.00 Mhrs.

Project Description :

Civil, Electromechanical, Painting and insulation works.
CSI scope including
o Civil works.
o Electrical and instrument work supply and installation.
o Supply and installation of the firefighting, fire alarm, paging, telecommunication and HVAC systems.
o Supply and installation of piping and steel structure.
o Insulation and painting.

Project Name :

Lube Oil Expansion

Duration :

10 months

Client :

F.W.F / Cgi.

Work Volume :

180,000 Mhrs / 45,000M2

Project Description :

Hot and Cold insulation works