Project Name :

Pre-commissioning of 12”/16”/24’’ gas line

Duration :

3 months

Client :

Moody International

Work Volume :

16 KM.

Project Description :

Execute the hydrostatic tests and the pre-commissioning activities according to the required specs and the following scope of work:
1. Initial cleaning andPurging.
2. Water filling and venting.
3. Hydrostatic testing.
4. Bulk dewatering.
5. Final dewatering.
6. Final cleaning and initial drying (for complete pipeline length)
7. Final drying.
8. Nitrogen purging and packing to 1 bar (including supplying nitrogen)
9. Pneumatic air leak test before and after the hydrostatic test
10. Supplying all needed cleaning and gauging pigs required
11. Supplying water and water drainage.
12. Loading and unloading.

Comments are closed.