Project Name :

Pre-commissioning of 8″, gas line

Duration :

2 months

Client :

Moody International

Work Volume :

10 Km

Project Description :

Execute the hydrostatic tests and the pre-commissioning activities according to the required specs and the following scope of work:
1. Initial Cleaning and Purging
2. Water Filling and Venting
3. Air Leak Test
4. Hydrostatic Testing
5. Bulk Dewatering
6. Air Leak Test
7. Final Dewatering.
8. Final Cleaning and Initial Drying (for complete pipeline length)
9. Final Drying
10. Nitrogen Purging and Packing to 1 bar (Including Supplying Nitrogen)
11. Supplying all needed cleaning and gauging pigs required