Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the login-customizer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/icsiegy/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/icsiegy/public_html/wp-includes/functions.php on line 6114
CSI – Electrical Projects -Karmouz 220-66 KV Station

Quick contact info

At C.S.I – we pride ourselves on being a Service Oriented company that anticipates client requirements and our relationship with each of our clients is built on open communications, integrity and a continually striving to learn, gain amp; document experience and innovate.

icon_widget_image Saturday - Thursday : 9 AM to 4 PM; Friday: Closed icon_widget_image 10 Mostafa Maher Street, Glim, Alexandria, Egypt icon_widget_image +2 (0127) 49 59 327 Tele : +2 (03) 58 69 024
a

Karmouz 220-66 KV Station

Karmouz 220-66 KV Station

Client:

AEGALSTOM Germany

Scope of work:

Turnkey job for Electromechanical & Instrument works including pre-commissioning and commissioning testing and start up. For Karmouz outdoor substation 220/66/11 KV including all activities

Work volume:

250,000 Mhrs

Final Destination:

Alexandria

Year:

1999