| S.N | Location | Client | Project | Scope of Work | Work Volume | Direct construction Man-hours | Execution Date |
|---|---|---|---|---|---|---|---|
| 1 | Ezz-El Dkhela | Air Liquide | ALX3 Transformer | Supply & installation of electrical work (cable ladders , Power cables , …. ) install conect & testing of equipment. | 2025 | ||
| 2 | Ezz-El Dkhela | Air Liquide | EZDK Sigma Cooling Tower | Assembly of Cooling tower | 22 Ton | 2025 | |
| 3 | El-Suez Egypt | Air Liquide | El Ezz Flat Steel El-Sokhna project | Supply, Installation of Firefighting and Fire and Gas systems | Fire fighting system for No.5 Shelters | 2024 | |
| 4 | El-Suez Egypt | Air Liquide | El Ezz Flat Steel El-Sokhna project | Supply, Installation of Electrical and Instrumentation package | 155,877 Hrs | 2024 | |
| 5 | El-Suez Egypt | Air Liquide | El Ezz Flat Steel El-Sokhna project | Fabrication, painting and Erection of Liquide O2 Storage Double wall tank | 105 Tons | 2024 | |
| 6 | El-Suez Egypt | Air Liquide | El Ezz Flat Steel El-Sokhna project | Warm Skid Leak Test | Around 80 Meter (13 Loop) | 2023 | |
| 7 | Sadat City | Air Liquide | ESR - Plant | Supply and Preparation of Instrument, Mechanical and Store Workshop Containers Supply and fabrication of I beam | 2014 | ||
| 8 | Sadat city | Air Liquide | ESR - Plant | Installation of 1''pressure regulator& its fixation and a barrier & gate for main air compressor area | 2013 | ||
| 9 | Sadat City | Air Liquide | Acetylene Filling Station | Supply, Fabrication and Commissioning of Fire Fighting System. | 2012 | ||
| 10 | El-Sokhna, Suez | Air Liquide | SGG | Civil and Mechanical Works as Follow: | 2010 | ||
| 11 | El-Sokhna, Suez | Air Liquide | SGG | Piping Prefabrication and Erection | 2010 | ||
| 12 | El-Sokhna, Suez | Air Liquide | SGG | Steel Structure Fabrication, Erection, Painting and Insulation | 2010 | ||
| 13 | El-Sokhna, Suez | Air Liquide | SGG | Equipment Erection | 2010 | ||
| 14 | Sadat City | Air Products | Sphinx Glass- Air Separation Unit. | E&I , Mechanical (Piping &Steel structure) Installation Works | 2010 | ||
| 15 | 6th of October | Air Liquide | SILPA 140 Air Separation Unit | Turn Key Job (Civil, E&I , Mechanical (Piping &Steel structure) installation works including pre commissioning and commissioning of the plant systems) | 22000 | 2009 | |
| 16 | Alexandria | Linda - Germany | Air Separation Plant | Electrical & Instrumentation Installation work. | 1995 | ||
| 17 | Alexandria | Technifrigo | Chlorine Liquefaction Plant | Civil, Mechanical , Sand Blasting & Painting , Hot\ Cold Insulation | 1994 | ||
| 18 | El-Arish | TecnimontKT | EMG-Gas compression station | (Turnkey job) Electrical & Instrumentation Installation work , including pre-commissioning and commissioning activites . | 2011 | ||
| 19 | Alexandria, El-Brullus | Thyssen Krupp Xervon | EL-Brullus Compression Station. | Electrical & Instrumentation Installation work , including pre-commissioning and commissioning activites . | 2009 | ||
| 20 | Alarish | KTI | EMG-Gas Compression Station | Electrical Work , including pre-commissioning and commissioning activites | 2008 | ||
| 21 | Alarish | KTI | EMG-Gas Compression Station | Instrument Installation , including pre-commissioning and commissioning activites | 2008 | ||
| 22 | IDKU – Alex | Bechtel overseas natural gas liquefaction com | LNG. Plant | Electrical & Instrumentation Installation work , including pre-commissioning and commissioning activites . | 2005 | ||
| 23 | Suez | Icom Engineering - Italy | Platform Reefers | Electrical & Instrumentation Installation work , including pre-commissioning and commissioning activites . | 2002 | ||
| 24 | Cairo | AEG/ALSTOM Germany | Heliopolis GIS 200/66/11 Kv | Electrical istallation , Equipment erection , cable tray installation , cable pulling , termination commissioning and start up . | (GIS 200/66/11 kv) | 2001 | |
| 25 | Alexandria | AEG/ALSTOM Germany | Heliopolis GIS 200/66/11 Kv | Electrical istallation , Equipment erection , cable tray installation , cable pulling , termination commissioning and start up . | 2001 | ||
| 26 | Alexandria | AEG/ALSTOM Germany | Midelec Substation | Electrical istallation , Equipment erection , cable tray installation , cable pulling , termination commissioning and start up . | 2000 | ||
| 27 | Suez | Carlo Gavazzi | Suez Steel Plant | E & I ( cable tray installation ,cable pulling , termination commissioning and start up , Instrumentation Installation work ,including pre-commissioning and commissioning activites | 2000 | ||
| 28 | Alexandria | Technip Italy | Naphta Reformer Complex | Electrical & Instrumentation Installation work , including pre-commissioning and commissioning activites . | Painting (150,000 M2) / Insulation. (45,000 M2) | 2000 | |
| 29 | Alex national steel -Dekhela, Alexandria | Siemens - Germany | Steel making /flat sheet plants | Electrical & Instrumentation Installation work , including pre-commissioning and commissioning activites . | 1999 | ||
| 30 | Alexandria | AEG/ALSTOM Germany | Karmoz 220/66Kv substation | Electrical & Instrumentation Installation work , including pre-commissioning and commissioning activites . | 1999 | ||
| 31 | Alexandria | DSD-Germany | Rod Mill Plant 750000ton/year | Electrical & Instrumentation Installation work , including pre-commissioning and commissioning activites . | 1997 | ||
| 32 | Alexandria | DSD-Germany | Main Lab. | Electrical & Instrumentation Installation work , including pre-commissioning and commissioning activites . | 1995 | ||
| 33 | Alexandria | Linda - Germany | Air Separation Plant | Electrical & Instrumentation Installation work , including pre-commissioning and commissioning activites . | 1995 | ||
| 34 | Damnhour | Nem - Holland | Damnhour / mahmoudia power plant | Electrical & Instrumentation Installation work , including pre-commissioning and commissioning activites . | 1994 | ||
| 35 | Wepco | Jacorossi- Italy | NAF Platform | Electrical & Instrumentation Installation work , including pre-commissioning and commissioning activites . | 1992 | ||
| 36 | Ex-C.S.I Borg El-Arab Factory | Hassan Allam | Mostakbal Misr Project | Fabrication & Painting of steel sections & Pipes | 14 Ton | 2023 | |
| 37 | C.S.I Borg El-Arab Factory | Hassan Allam Construction | North Luxor Project | Fabrication & Painting of Steel Works for North Luxor Bridge Project | 223.6 Tons | 2022 | |
| 38 | C.S.I Borg El-Arab Factory | Hassan Allam Construction | Al-Alamein Sheds Project | Fabrication & Painting of Steel Work for Al-Alamein Shed Project | 20.2 Tons | 2022 | |
| 39 | C.S.I Borg El-Arab Factory | Hassan Allam Construction | Bashteel Project | Fabrication & Painting of Steel Work for Bashteel Project | 44.5 Tons | 2022 | |
| 40 | FCA-C.S.I Borg El-Arab Factory | Boldrocchi | Fabrication of No.6 Steel works for fan housing complete of No.6 inlet compensators + No.6 Outlet compensators + No.6 Pedestals | Supply , Fabrication, painting , packing and delivery of No.6 fan housing + No.6 Inlet Compensators + No.6 Outlet Compensators + No.6 Pedestals | 184.4 Tons | 2022 | |
| 41 | C.S.I Borg El-Arab Factory | Steel For Engineering | Dubai internet city | Supply, fabrication, hot-dip galvanizing & painting of stairs and handrails | 5 Tons | 2021 | |
| 42 | C.S.I Borg El-Arab Factory | Boldrocchi | Fabrication of No.1 steel structures for aircooler | Supply , Fabrication, painting , packing and delivery of No.1 Steel structure for Air coolers | 5.5 Tons | 2021 | |
| 43 | C.S.I Borg El-Arab Factory | Hassan Allam Construction | EMAAR Bridge | Fabrication and painting of Emaar brigde steel | 128 Ton | 2021 | |
| 44 | C.S.I Borg El-Arab Factory | Boldrocchi | Bag filter fabrication-Buzzi Cement Plant (USA) | Fabrication of No.1 steel structure relevant to Bag filter (Hoppers,casing,inlet dampers and covering structure) | 43 Ton | 2021 | |
| 45 | C.S.I Borg El-Arab Factory | Hassan Allam Construction | SPHINX AIRPORT TERMINAL BUILDING | Fabrication and painting of steel building | 100 Ton | 2021 | |
| 46 | Midor Alexandria | Dgskie trading | Tractor Factory | Supply, Fabrication, Painting , Assembly , Erection , and Transportation of 4 crane girder to Midor site. | 6 Ton | 2020 | |
| 47 | Toshiba Factory | Dgskie trading | Crane Girders (Toshiba Factory) | Supply, Fabrication, Sand blasting , Painting , and erection of double girders for 10 ton crane. | 7 Ton | 2020 | |
| 48 | C.S.I Borg El-Arab Factory | Hassan Allam Construction | Toshka | Fabrication and , painting of Steel Pipes | 9.8 Ton | 2020 | |
| 49 | C.S.I Borg El-Arab Factory | Hassan Allam Construction | El-Hadarat bridge | Fabrication and painting of Steel Pipes | 50 Ton | 2020 | |
| 50 | Fabrication , painting and assembly of steel beams | 350 Ton | 2020 | ||||
| 51 | C.S.I Borg El-Arab Factory | Siemens | Steel structure items Beni Suef power station | Design , supply , fabrication and painting of steel structure | Around 16,000 Kgs | 2019 | |
| 52 | Faraskour | EMC | Fire water tank "Faraskour El Wastany Company" | Supply, prefabrication, welding, erection and hydrotesting of carbon steel water storage tank. | Around 22,715 kgs | 2019 | |
| 53 | C.S.I Borg El-Arab Factory | Boldrocchi | Gas Capacity Increase Project "Algeria" | Supply, Fabrication and , Inspection of No.6 Steel Structure & No.1 Rack of air cooler | No.6 Steel Structure & No.1 Rack "74.8 Ton" | 2019 | |
| 54 | C.S.I Borg El-Arab Factory | Boldrocchi | Zohr Development Project | Supply, Fabrication, Inspection and Painting of No.4 Steel structure | No.4 Steel Structure 52.6 Ton | 2018 | |
| 55 | Mostorod | GS E&C | ERC Refinery Project | Installation of steel structure | St. St.: 2,967 Ton | 2018 | |
| 56 | Mostorod | GS E&C | ERC Refinery Project | Painting of steel structure | St. St.: 2,967 Ton | 2018 | |
| 57 | C.S.I Borg El-Arab Factory | AMCO/ Thermoengineering | Naphta Complex Project | Supply, Fabrication, Inspection and Painting of Derrick legs and structural profiles | 7,300 Kgs of Derrick legs & 10,910 Kgs of Structural Profiles | 2018 | |
| 58 | C.S.I Borg El-Arab Factory | AMCO/ Thermoengineering | Naphta Complex Project | Supply, Fabrication, Inspection and Painting of Vertical Ladders, Platforms, Hand- rails and Gratings | 7,585 Kgs of Ladders & Platforms 46 m² of Gratings (HDG | 2018 | |
| 59 | C.S.I Borg El-Arab Factory | AMCO/ Thermoengineering | Naphta Complex Project | Supply, Fabrication, Inspection and Hot Dip Galvanization of Templates and Anchor Bolts | 74 Kgs of Templates & 219 Kgs of Anchor Bolts | 2018 | |
| 60 | C.S.I Borg El-Arab Factory | AMCO/RESTA S.p.A. | Zohr Development Project "Phase 2" | Supply, Fabrication, Inspection and Painting of Vertical Ladders, Platforms, Hand- rails and Gratings | 15,100 Kgs of Ladders & Platforms 110 m² of Gratings (HDG) | 2018 | |
| 61 | C.S.I Borg El-Arab Factory | AMCO/ Thermoengineering | Zohr Development Project "Phase 2" | Supply, Fabrication, Inspection, Hot Dip Galvanization and Painting of the Derrick Structural Components | 56,600 Kgs of Derrick Legs (Columns) and | 2018 | |
| 62 | C.S.I Borg El-Arab Factory | AMCO/ HEMACO | Zohr Development Project "Phase 2" | Supply, Fabrication, Inspection and Painting of Vertical Ladders, Platforms, Hand- rails and Gratings | 982 Kgs of Ladders & Platforms 6.75 m² of Gratings (HDG) | 2018 | |
| 63 | C.S.I Borg El-Arab Factory | Tozzi / Amco | Zohr Development Project | Supply , fabrication and assembly of 4 salt bins | around 6 ton | 2017 | |
| 64 | C.S.I Borg El-Arab Factory | Kinetics Technology Kt | MATS Project | Design, Supply and fabrication of steel structure | around 40 Ton | 2017 | |
| 65 | C.S.I Borg El-Arab Factory | Boldrocchi | Zohr Development Project | Supply and fabrication of Steel Structures for Fin Fan Coolers of approximate weight of 36 Ton. | 36 Ton | 2017 | |
| 66 | Alexandria | Kinetics Technology Kt | MATS Project | Supply, fabrication, installation and hydrotest of Molten Salt tank of stainless steel 321H | 15 Ton | 2017 | |
| 67 | Alexandria | Thermo-Engineering / Petrobel | ZOHR Phase 1 Project | Supply and fabrication of HP/LP/ LLP Flare Package | 65 Ton | 2017 | |
| 68 | Ismalyia & Damietta | Boldrocchi | AL-Shabab Power Plant | Supply No. 3 Steel Structures for Fin Fan Coolers | 136 Ton | 2016 | |
| 69 | C.S.I Borg El-Arab Factory | Kinetics Technology Kt | Zohr Project | Supply and fabrication of no. 1,750 anchors with approximate weight of 10 ton. | 1,750 anchor ≈ 10 ton | 2016 | |
| 70 | Bourg El-Arab | Cargill-NVOC | De-hulling Sandy Camel Project | Equipment dismantle and erection and steel structure fabrication and erection | Equipment No.:59 | 2016 | |
| 71 | C.S.I Borg El-Arab Factory | ACCIONA | Stage 2, Phase 2 Gabal Al Asfar WWTP project | Supply and fabrication of Stainless steel wall pipes for pumping stations | 2015 | ||
| 72 | C.S.I Borg El-Arab Factory | Boldrocchi | HOLCIM HOGERS TOWN - KHD Project | Fabrication, Painting, galvanization and final preassembly of steel equipment (i.e. bag filter, By pass Filter and Heat Exchanger) | 230 Ton | 2015 | |
| 73 | C.S.I Borg El-Arab Factory | Boldrocchi | Delta Steel Project | Supply Fabrication and painting of Carpentries and Fan housing | 75 Ton | 2015 | |
| 74 | IDKU | ELNG | Waste Heat Recovery Unit | Supply, Fabrication, Erection of St. Structure Works | 270 Ton | 2014 | |
| 75 | C.S.I Borg El-Arab Factory | Boldrocchi | Kiln & Raw Mill Existing Bag house Conversion | Fabrication and Painting and assembly of various steel equipment (i.e. Plenum, Hopper, casing, Filter house, Heat Exchanger… etc.) | 200 Ton | 2014 | |
| 76 | Bourg El-Arab | Cargill-NVOC | Road Behind BG. 07 | Supply & Execution of Civil and Steel Works | 1,200 m2 | 2014 | |
| 77 | C.S.I Borg El-Arab Factory | EthydCo. | Derrick Structure and Riser | Fabrication of Derrick Structure and relevant flare riser including painting and galvanization work in addition to complete preassembly for fabricated Items | around 450 Tons | 2014 | |
| 78 | C.S.I Borg El-Arab Factory | Motridal | Anchor Bolts | Supply & Fabrication of Anchor Bolts | 2013 | ||
| 79 | C.S.I Borg El-Arab Factory | Kahromika | Suez Thermal Power Plant STG | Supply and Fabrication of Embedded Parts | 2013 | ||
| 80 | Borg El‐Arab Industrial Zone | TOTAL | TOTAL TEBU | Supply, Fabrication, Painting, Insulation and Erection of Steel Structure, Pipe Rack and Equipment | Steel Structure 108 Ton | 2012 | |
| 81 | AL- Soukhna | DANIELI | DANIELI SMP site Suez Egypt | Modify Steel Pins | 2011 | ||
| 82 | C.S.I Borg El-Arab Factory | AMCO/ Thermoengineering | TE‐ENPPI/GPC‐Project | Supply, Fabrication & Painting of Elevated Flare Package | 2011 | ||
| 83 | C.S.I Borg El-Arab Factory | AMCO | Thermal Oxidizer | Supply & Fabrication and Painting of 1 Unit Thermal Oxidizer with its Ladders and Platforms | 2010 | ||
| 84 | C.S.I Borg El-Arab Factory | Hassan Allam | Arabian cement company-ACC / RHI (reliance heavy industries). | Supply & Fabrication of Belt Conveyor Parts, Silo and Chutes | 2010 | ||
| 85 | Alexandria | Technip Italy | MIDOR DCU EXPANSION | Design, Supply, Fabrication, Painting & Installation of Steel Structure and Anchor Bolts. | 2009 | ||
| 86 | Alexandria, | Technip Italy | DCU EXPANSION PROJECT | Detailed Engineering, Supply and Erection of Warehouse Building with Relevant Internal Office and Offices Building | 2009 | ||
| 87 | C.S.I Borg El-Arab Factory | EFJV | Cairo Metro Line 3 | Supply & Fabrication Of Steel Segments | 2008 | ||
| 88 | C.S.I Borg El-Arab Factory | ELNG | ELNG - Plant Idku | Supply, Fabrication, Painting & Installation of A-Frame | 2008 | ||
| 89 | Bourg El-Arab | Cargill-NVOC | New Partitions / New Front Office / Gas Storage | Civil and Steel Structure Work | 2008 | ||
| 90 | Alexandria | DAMIETTA LNG CONSTRUCTION LLC | Sun Shade for INCOESA Transformer | Supply of Galvanized Steel Sections | 2007 | ||
| 91 | C.S.I Borg El-Arab Factory | Kahromika | Pulp Dryer for Nubaria Sugar Factory 300 ton | Fabrication of Steel Equipment | 2007 | ||
| 92 | Cairo- Elgabal Elasfar | Degremont | Waste Water Treatment Unit | Fabrication & Installation of Piping & Steel Structure | 2005 | ||
| 93 | C.S.I Borg El-Arab Factory | Carlo Gavazzi | Midor Refinery Expansion Project | INSTRUMENT SUPPORTS AND JUNCTION BOX FRAMES LOT 7 | 2 Tons | 2022 | |
| 94 | C.S.I Borg El-Arab Factory | Carlo Gavazzi | Midor Refinery Expansion Project | INSTRUMENT SUPPORTS AND JUNCTION BOX FRAMES LOT 6 | 2.42 Tons | 2022 | |
| 95 | C.S.I Borg El-Arab Factory | Boldrocchi | Fabrication of Steel Works for Base Frames | Supply, Fabrication, Painting and Machining of Motor Base Frames | 9.25 Tons | 2022 | |
| 96 | C.S.I Borg El-Arab Factory | Carlo Gavazzi | Midor Refinery Expansion Project | INSTRUMENT SUPPORTS AND JUNCTION BOX FRAMES LOT 5 | 6.193 Tons | 2021 | |
| 97 | C.S.I Borg El-Arab Factory | Carlo Gavazzi | Midor Refinery Expansion Project | INSTRUMENT SUPPORTS AND JUNCTION BOX FRAMES LOT 4 | 25 Ton | 2021 | |
| 98 | C.S.I Borg El-Arab Factory | Carlo Gavazzi | Midor Refinery Expansion Project | Supply of Instrument Supports for concrete floor LOT 3 | 4 Ton | 2021 | |
| 99 | C.S.I Borg El-Arab Factory | Carlo Gavazzi | Midor Refinery Expansion Project | SUPPLY OF GALVANIZED SUPPORTS, JUNCTION BOX FRAMES LOT 1 | 14 Ton | 2021 | |
| 100 | C.S.I Workshop-IDKU | ELNG | Aluminum Solar Cell Supports | Supply and Fabrication of Aluminum Solar Cells Supports | 2007 | ||
| 101 | C.S.I Borg El-Arab Factory | Boldrocchi | Fabrication of No.1 Air intake + Compensators | Supply , Fabrication, painting , packing and delivery for No.1 Air intake +compensators | 18.824 Tons | 2022 | |
| 102 | C.S.I Borg El-Arab Factory | Boldrocchi | Fabrication of No.2 Air intakes for fans + No.4 Inlet compensators +No.4 Outlet compensators | Supply , Fabrication, painting , packing and delivery of No. 2 air intakes | 17.4 Tons | 2022 | |
| 103 | C.S.I Borg El-Arab Factory | Boldrocchi | Deir Azzour Project (Syria) | Supply & Fabrication for N.2 Air Intake System | 340 Ton | 2016 | |
| 104 | C.S.I Borg El-Arab Factory | Boldrocchi | El Mahmoudia Power station | Supply & Fabrication for N.2 Air Intake System | 220 Ton | 2015 | |
| 105 | C.S.I Borg El-Arab Factory | Boldrocchi | N.2 Intake systems for GT AE94.2 6th October Extension P.P | Supply & Fabrication for N.2 Air Intake System | 320 TON | 2014 | |
| 106 | C.S.I Borg El-Arab Factory | AMCO/ Thermoengineering | Naphta Complex Project | Supply, Fabrication and , Inspection of air duct | 8,300 Kgs of air duct | 2018 | |
| 107 | C.S.I Borg El-Arab Factory | Boldrocchi | Yamma cement plant in KSA | Supply, Fabrication and painting of set of ducts and miscellaneous | around 28 Ton | 2016 | |
| 108 | C.S.I Borg El-Arab Factory | Boldrocchi | N. 3 Bag Filters + Ducts | Supply & Fabrication of air Ducts | 190 TON | 2013 | |
| 109 | C.S.I Borg El-Arab Factory | Delta Engineering | Internal Painting of No.32 Tanks | Supply and application of painting for 32 tanks | 32 Tanks | 2022 | |
| 110 | C.S.I Borg El-Arab Factory | El Magd Warner Lewis | AL-ALAMAIN FUEL FARM PROJECT | FABRICATION OF JET FUEL TANKS | 177.3 Tons | 2022 | |
| 111 | C.S.I Borg El-Arab Factory | El Magd Warner Lewis | Sigma Tank | Supply and Fabrication of Tank | 18 Tons | 2021 | |
| 112 | C.S.I Borg El-Arab Factory | Oceanic Oil Services | Fabrication of Process Tank | Supply and Fabrication of Process Tank | 8 Ton | 2021 | |
| 113 | Borg El‐Arab Industrial Zone | TOTAL | TOTAL TEBU | Tank Farm | Tanks (18 tank) | 2012 | |
| 114 | C.S.I Yard - Alarish | KTI -HTI | Raw & Fire water tank | Design, Supply, Fabrication, Installation, Sand Blasting & Painting of Raw & Fire Water Tank | (2,285 Mt3) | 2007-02-01 00:00:00 | 2007 |
| 115 | C.S.I Borg El-Arab Factory | Midwater | MIDOR WATER SUPPLY SYSETM RO WTP. | Supply of No.1 Dual media filters | No.1 DMF, No.1 Access platform | 2024 | |
| 116 | C.S.I Borg El-Arab Factory | WTD/Midwater | MIDOR WATER SUPPLY SYSETM RO WTP. | Supply of No.3 Dual media filters | No.3 DMF, No.1 Access platform | 2021 | |
| 117 | FCA-C.S.I Borg El-Arab Factory | Boldrocchi | Sinai Cement Project | Supply , fabrication & painting of Bag Filter | 58900 Kg | 2024 | |
| 118 | FCA-C.S.I Borg El-Arab Factory | Boldrocchi | El-Gabon Project | Supply, Fabrication, painting, and packing of complete Bag filter components and its Conditioning Towers | 420.88 Tons | 2023 | |
| 119 | Suez | Boldrocchi | SUEZ Cement Project | Supply, Fabrication of carpentries for new de-dusting system (bypass filter and plenum for cooler and Kiln/Raw Mill bag filters) | 130 Ton | 2017 | |
| 120 | C.S.I Borg El-Arab Factory | Boldrocchi | Yamma cement plant in KSA | Supply, Fabrication and painting of No.2 mill bag filter, No.1 separator filter, set of ducts and miscellaneous | around 28 Ton | 2016 | |
| 121 | C.S.I Borg El-Arab Factory | Boldrocchi | N. 3 Bag Filters + Ducts | Supply & Fabrication of N. 3 Bag Filters + Ducts | 190 TON | 2013 | |
| 122 | West Nile Delta | Carlo Gavazzi | BP West Nile Delta Gas Development | Sand plastic and galvanization of Scaffolding Pipes | 15 Ton | 2023 | |
| 123 | C.S.I Borg El-Arab Factory | Siemens | Fabrication of No.5 Pipe Supports | Supply, Fabrication & Painting of No.5 Pipe Supports Lot 2 | 531.15 Kg | 2022 | |
| 124 | C.S.I Borg El-Arab Factory | Siemens | Fabrication of No.5 Pipe Supports | Supply, Fabrication & Painting of No.5 Pipe Supports Lot 2 | 531.15 Kg | 2022 | |
| 125 | C.S.I Borg El-Arab Factory | Siemens | Fabrication of No.5 Pipe Supports | Supply, Fabrication & Painting of No.5 Pipe Supports Lot 1 | 531.15 Kg | 2021 | |
| 126 | C.S.I Borg El-Arab Factory | WTD/Midwater | MIDOR WATER SUPPLY SYSETM RO WTP. | Electrical piping supports 1 Ton | 1 Ton | 2021 | |
| 127 | C.S.I Borg El-Arab Factory | WTD/Midwater | MIDOR WATER SUPPLY SYSETM RO WTP. | Additional Piping supports 6 Ton | 6 Ton | 2021 | |
| 128 | C.S.I Borg El-Arab Factory | WTD/Midwater | MIDOR WATER SUPPLY SYSETM RO WTP. | Structure , Skids , piping supports | 6 Ton | 2021 | |
| 129 | Mostorod | Enppi | ERC Refinery Project | Performing Welding & Piping work | Welding of 6,022 joints | 2019 | |
| 130 | Mostorod | GS E&C | ERC Refinery Project | Fabrication and installation of piping work erection | Piping: 46,000 DI | 2018 | |
| 131 | Mostorod | GS E&C | ERC Refinery Project | piping work Precommissioning | Piping: 46,000 DI | 2018 | |
| 132 | Alexandria | Kinetics Technology Kt | MATS Project | Supply and Installation of Insulation mateirals required for piping, Equipment and tank | 2500 sqm | 2017 | |
| 133 | Borg El‐Arab Industrial Zone | TOTAL | TOTAL TEBU | Piping Process and Facilities Networks | Piping 300 Ton | 2012 | |
| 134 | Cairo | Termomeccanica | Cairo West Project | Supply of Pipes and Fittings | 2010 | ||
| 135 | Alexandria, Bourg El-Arab | MAS Engineering | Delta Dying Factory | Erection of Water Drainage Network (Piping Work) | 2009 | ||
| 136 | Damnhour | Shabakat | Mahmoudia - Gas Pipelines | Nitrogen Purging and Drying of 6” gas line | 3 KM | 2009 | |
| 137 | C.S.I Borg El-Arab Factory | Uhde GmbH | Different types of Pipe Supports / PDH-PP Plant - Port Said | Supply, Fabrication & painting for standard & special pipe supports both CS & SS | 700 Ton | 2009 | |
| 138 | Bourg El-Arab | MAS Engineering | Filmar Nile Textile Sewer Piping System | Fabrication and Installation Filmar Nile Textile Sewer System (Piping Work) | 2008 | ||
| 139 | C.S.I Borg El-Arab Factory | Petrofac | Western Desert Khalda (El-Salam Plant) | Piping Prefabrication Works | 60,000 DI | 2008 | |
| 140 | Alarish | KTI | EMG-Gas Compression Station | Civil Works and Installation of Gas Pipelines | Pipeline = 1200 LM | 2008 | |
| 141 | Libya | Technip | Pipline from Wafa desert to Mellitah | Pipline 700 km inspection from Wafa desert to Mellitah on behalf of technip | 20 Persons Supervision | 2005 | |
| 142 | Ex-C.S.I Borg El-Arab Factory | Carlo Gavazzi | BP West Nile Delta Gas Development | Sand plasting and galvanization of Scaffolding acessories (double coupler and cup look ledger) | 15 Ton | 2023 | |
| 143 | C.S.I Borg El-Arab Factory | DYPNF | Embedded Plates | PAINTING WORK | 1.35 Ton | 2021 | |
| 144 | C.S.I Borg El-Arab Factory | Siemens | Cooling tower Bypass stop logs & Guides -Beni Suef power station | painting work | 4 sets of bypass stop logs and guids | 2019 | |
| 145 | El-Arish | TecnimontKT | EMG-Gas compression station | (Turnkey job) Painting and Insulation. | 2011 | ||
| 146 | C.S.I Borg El-Arab Factory | MI-SWACO | Skid painting | Sand Blasting and Painting work | 2011 | ||
| 147 | C.S.I Borg El-Arab Factory | MI-SWACO | Centrifugal Short Stand | Painting of Short Stand Centrifugal | 2008 | ||
| 148 | Alarish | KTI | EMG-Gas Compression Station | Painting Works. | 2008 | ||
| 149 | C.S.I Borg El-Arab Factory | LoTec, Inc. USA | (4) FH Intake Systems | Sand Blasting, Painting & Insulation work | 2007 | ||
| 150 | Alexandria | ABB | Acpa | Sand blasting & Painting work. | 2004 | ||
| 151 | Alexandria | T.R. | Asspc | Sand Blasting & Painting work. | 2004 | ||
| 152 | Alexandria | Technip Italy | Thiopaq Plant (AMOC) | Painting & Insulation work | 2007 | ||
| 153 | Alexandria | Technip Italy | Naphta Reformer Complex | Painting & Insulation work. | Painting (150,000 M2) / Insulation. (45,000 M2) | 2000 | |
| 154 | Cairo | Lurgi Rest Italy | Isomerization Plant | Sand Blasting & Painting work. | 1998 | ||
| 155 | Alexandria | FWF/Cgi | Lube Oil Expansion (AMOC) | Hot / Cold Insulation work. | 2018 | ||
| 156 | Epco -Alex | Technip Italy | Boiler Plant | Insulation work. | (12,000 M2 ) | 2018 | |
| 157 | Alexandria | Petrojet - Pirelli | Alex Tires | Painting work. | 10,000 M2 | 1995 | |
| 158 | Ex-C.S.I Borg El-Arab Factory | Hassan Allam | El-Dabaa Nuclear | Cutting Assembly, Welding, & finish of Embedded parts | 8 Ton | 2023 | |
| 159 | C.S.I Borg El-Arab Factory | Carlo Gavazzi | BP West Nile Delta Gas Development | Supply , Fabrication of No.1 Loudspeaker Pole | 88 Kg | 2022 | |
| 160 | C.S.I Borg El-Arab Factory | AMCO | Flare Package for UTILITIES & OFFSITE FOR ASORC NAPHTHA COMPLEX PROJECT | Repair of damaged parts | 10 Ton | 2022 | |
| 161 | C.S.I Borg El-Arab Factory | DYPNF | Embedded Plates | SUPPLY, FABRICATION AND DELIVERY OF EMBEDDED PLATES. | 1.35 Ton | 2021 | |
| 162 | C.S.I Borg El-Arab Factory | Amco/Midor | Flair Tips Repair | Welding Repair for Flair Tips | No.2 Flare Tips | 2020 | |
| 163 | C.S.I Borg El-Arab Factory | Siemens | Cooling tower Bypass stop logs & Guides -Beni Suef power station | Supply, Fabrication of stop logs & guides | 4 sets of bypass stop logs and guids | 2019 | |
| 164 | C.S.I Borg El-Arab Factory | Boldrocchi | Suez El-Sokhna Plant (Clinker Cooler Bag Filter) | Supply, fabrication transportation of loose materials | 1798.7 Kg of HARDOX 450 & 121.9 Kg of S235 JR | 2019 | |
| 165 | Suez | Boldrocchi | SUEZ Cement Project | Repair work and erection of carpentries for new de-dusting system | 130 Ton | 2017 | |
| 166 | Alexandria | Namaa Engineering and Trading | Process Water Stripper Reboiler | Mechanical (Heat Exchanger Retubing) | 2012 | ||
| 167 | C.S.I Borg El-Arab Factory | Rossetti Marino | ENNPI Amer 8 Chemical Injection Package | Fabrication & assembly of Chemical Injection Skid | 3500 Construction manhours | 2011 | |
| 168 | El-Arish | TecnimontKT | EMG-Gas compression station | (Turnkey job) Mechanical work | 2011 | ||
| 169 | C.S.I Borg El-Arab Factory | Elite | Parking Hydraulic Lifting Car Machine | Supply and Fabrication of Hydraulic Lifting Car Machine | 2009 | ||
| 170 | C.S.I Borg El-Arab Factory | MI-SWACO | Centrifugal Short Stand | Supply, Fabrication of Short Stand Centrifugal | 2008 | ||
| 171 | C.S.I Yard - 6th of October | Chipsy for Food Industries | Line 1, 2& 3 Seasoning Machine | Supply, Fabrication & Installation | 2008 | ||
| 172 | C.S.I Borg El-Arab Factory | MI-SWACO | Prefabricated Assemblies | Supply and Fabrication | 2008 | ||
| 173 | C.S.I Borg El-Arab Factory | MI-SWACO | Metal Covers & Sealed Flanges | Supply and Fabrication | 2008 | ||
| 174 | Alarish | KTI | EMG-Gas Compression Station | Pre-Commissioning Activity and Assistance to Commissioning Activity | 2008 | ||
| 175 | Alarish | KTI | EMG-Gas Compression Station | Mechanical Works | 2008 | ||
| 176 | C.S.I Yard - 6th of October | Chipsy for Food Industries | WM Local Built | Supply, Fabrication & Installation | 2007 | ||
| 177 | C.S.I Yard - 6th of October | Chipsy for Food Industries | Conveyor Platforms | Supply, Fabrication & Installation | 2007 | ||
| 178 | C.S.I Borg El-Arab Factory | LoTec, Inc. USA | (4) FH Intake Systems | Supply, Fabrication work. | 2007 | ||
| 179 | Damietta | Thyssen Krupp | MOBCO | Supply of Galvanized C-Channel 80 | 2007 | ||
| 180 | Libya- Tripoli | Be-Six -Belgium | Sahel & Sahara Bank | Supply, Fabrication & Installation of HVAC system | 2006 | ||
| 181 | C.S.I Yard - 6th of October | Chipsy for Food Industries | New Line for Food Processing | Supply, Fabrication & Installation | 2006 | ||
| 182 | Alexandria | ADC - France | Crane Girders | Mechanical | 2004 | ||
| 183 | Alexandria | Technip Italy | Thiopaq Plant (AMOC) | Mechanical, Rehabilitation, Start up, Operation & Maintenance Activities | 2004 | ||
| 184 | C.S.I Borg El-Arab Factory | AMCO/ Thermoengineering | Derrick Structure | Supply and Fabrication work | 2002 | ||
| 185 | Alexandria | Endico - Eco | Varta Environment System | Mechanical | 2002 | ||
| 186 | Free Zone - Alex | Daelim | Middle East Oil Refinery | Mechanical | 2001 | ||
| 187 | Alexandria | EPCO | Main Drainage Pit | Mechanical | 1996 | ||
| 188 | Alexandria | Technip Italy | Naphta Reformer Complex | Mechanical Works | Painting (150,000 M2) / Insulation. (45,000 M2) | 2000 | |
| 189 | Cairo | Lurgi Rest Italy | Isomerization Plant | Mechanical Works | 1998 | ||
| 190 | Alexandria | ESACO | Gas Pipe Line Network | Mechanical works (Pipeline Installation) | Manhours=150,000 | 1996 | |
| 191 | Alexandria | Technip Italy | Middle East Oil Refinery | Mechanical (Piping) | 10,000 Di inch | 2000 | |
| 192 | El-Alamine , Egypt | El-Marasem | Rotana Hotel | Installation & testing of plumping & fire fighting package | 2000 m piping with accessorices, plus firefighting package | 2023 | |
| 193 | GUPCO - Port Said | ABB | TAURT and LTS 3 | Test Ring to Calibrate Various Sizes of PSV | 2008 | ||
| 194 | GUPCO - Port Said | ABB | TAURT and LTS 3 | Test Ring of instruments' calibration | 2008 | ||
| 195 | 6th of October | Moody International | El-Sharkia Tobacco Gas Line | Hydrostatic Test and The Pre-commissioning Activities of 12”/16”/24’’ Gas Line | 17.5 km | 2007 | |
| 196 | Nubaria | Moody International | Nubaria Sugar Factory | Hydrostatic Test and The Pre-commissioning Activities of 8" Gas Line | 11 km | 2007 | |
| 197 | IDKU – Alex/EMC | ELNG | ELNG. Plant | Calibration of Valves Instrument | Manhours =5000 | 2005 | |
| 198 | C.S.I Borg El-Arab Factory | Midwater | MIDOR WATER SUPPLY SYSETM RO WTP. | Civil works | 2024 | ||
| 199 | El-Sadat City, Monufia | EGYMI | Face Mask Production Line Factory | Supply and Installation of Mask Factory Building | Overall area 243.7 m2 | 2020 | |
| 200 | El-Arish | TecnimontKT | EMG-Gas compression station | (Turnkey job) Civil Work. | 2011 | ||
| 201 | El-Sokhna, Suez | Saint Gobain | Inside Manholes & Gas Reduction Slab | Civil works "Storage Building" | Manhours=140,000 | 2010 | |
| 202 | Alexandria | ABB | Gas Turbine Pilling Works | Civil work | Manhours=150,000 | 2000 | |
| 203 | Alexandria | Esacontra steel | Contra Steel Factory | Civil work | 1998 | ||
| 204 | Cairo - Heliopolis | Arab Contractor | ABB Head Quarter Building | Civil work | 1998 | ||
| 205 | Alexandria | DSD-Germany | High Tolerance Concrete Slabs | Civil works | 1997 | ||
| 206 | Alexandria | EPCO | Main Drainage Pit | Civil works | 1996 | ||
| 207 | Alexandria | Petrojet - Pirelli | Alex Tires | Civil works | 1995 | ||
| 208 | Midor Alexandria | Delta Engineering | Midor Refinery Expansion | Manpower for Repair & Maintenance of Vessels and equipment | 20 Persons | 2023 | |
| 209 | Midor Alexandria | GBM | Midor Refinery Expansion | Manpower for Repair & Maintenance of Vessels and equipment | 20 Persons | 2023 | |
| 210 | Beni Sueff | Siemens | Beni Sueff Project | Provide service "Manpower Supply" to Beni Suief Project | 272 Hr | 2022 | |
| 211 | Beni Sueff | Seagull | Change of Motor Fan Gear Box and Inspection | Manpower Supply for repair of 10 gear box units | 10 Gear Box units | 2022 | |
| 212 | Alexandria | Technimont KT | TECHNIP IT -EP WORKS FOR MIDOR | Manpower Supply | 10 Persons | 2021 | |
| 213 | Suez | Boldrocchi | SUEZ SOKHNA-PLANT | MANPOWER AND EQUIPMENT SUPPLY | 20 Persons | 2017 | |
| 214 | Al Arish / Egypt | KTI star | 30544/EMG EL‐Arish Gas Compression Station | Manpower Supply in all disciplines | 10 Persons | 2008 | |
| 215 | Kuwait | Technip | TPL 2241 – OL2K ETHELYNE Project | Manpower Supply in all disciplines | 10 Persons | 2007 | |
| 216 | Khurasania / KSA | Technip | KHURSANIAH GAS PLANT, KINGDOM OF SAUDI ARABIA | Manpower Supply in all disciplines | 10 Persons | 2007 | |
| 217 | Tripoli / Libya | Besix | Banque sahelo ‐ saharienne pour lʹinvestissement et lecommerce headquarters ‐ Tripoli | Manpower Supply in all disciplines | 2006 | ||
| 218 | UAE | Technip | TPL 2137 cda 751/CUO 187 ‐ Unleaded gasoline / low sulphur gas plant | Manpower Supply in all disciplines | 10 Persons | 2005 | |
| 219 | Mellitah / Libya | Technip | western Libya gas project ‐(Wafa coastal project ‐ Mellitah) | Manpower supervision Supply in all disciplines on behalf technip | 20 Persons | 2004 | |
| 220 | Egypt | Alstom | Alex Cement Substation | Manpower Supply in all disciplines | 2000 | ||
| 221 | Khurasaniah/KSA | Technip | ETHELYNE Project | Manpower Supply in all disciplines | 10 Persons | 2002 | |
| 222 | Yanbu/KSA | Technip | ETHELYNE Project | Manpower Supply in all disciplines | 10 Persons | ||
| 223 | Ruwais/UAE | Technip | TPL 2137 cda 751/CUO 187 ‐Unleaded gasoline / low sulphur gas plant | Manpower Supply in all disciplines | 10 Persons | ||
| 224 | Kuwait | Technip | TPL 2241 – OL2K ETHELYNE Project | Manpower Supply in all disciplines | 10 Persons | ||
| 225 | Ras Laffan/Qatar | Technip | TPL 2158 CDA 751/CUO 187 ‐ Oryx GTL Limited | Manpower Supply in all disciplines | 20 Persons | ||
| 226 | Biskra/Algeria | ABB | NK1 SP3 | Manpower Supply in all disciplines | |||
| 227 | Alarish | KTI | EMG | Manpower Supply in all disciplines | 10 Persons |