S.NLocationClient ProjectScope of Work Work VolumeDirect construction Man-hoursExecution Date
1Ezz-El Dkhela Air LiquideALX3 TransformerSupply & installation of electrical work (cable ladders , Power cables , …. ) install conect & testing of equipment.2025
2Ezz-El Dkhela Air LiquideEZDK Sigma Cooling Tower Assembly of Cooling tower 22 Ton 2025
3El-Suez EgyptAir LiquideEl Ezz Flat Steel El-Sokhna project Supply, Installation of Firefighting and Fire and Gas systemsFire fighting system for No.5 Shelters 2024
4El-Suez EgyptAir LiquideEl Ezz Flat Steel El-Sokhna project Supply, Installation of Electrical and Instrumentation package155,877 Hrs2024
5El-Suez EgyptAir LiquideEl Ezz Flat Steel El-Sokhna project Fabrication, painting and Erection of Liquide O2 Storage Double wall tank 105 Tons2024
6El-Suez EgyptAir LiquideEl Ezz Flat Steel El-Sokhna project Warm Skid Leak TestAround 80 Meter (13 Loop)2023
7Sadat CityAir LiquideESR - PlantSupply and Preparation of Instrument, Mechanical and Store Workshop Containers Supply and fabrication of I beam2014
8Sadat cityAir LiquideESR - PlantInstallation of 1''pressure regulator& its fixation and a barrier & gate for main air compressor area2013
9Sadat CityAir LiquideAcetylene Filling StationSupply, Fabrication and Commissioning of Fire Fighting System.2012
10El-Sokhna, SuezAir LiquideSGG Civil and Mechanical Works as Follow:2010
11El-Sokhna, SuezAir LiquideSGG Piping Prefabrication and Erection2010
12El-Sokhna, SuezAir LiquideSGG Steel Structure Fabrication, Erection, Painting and Insulation2010
13El-Sokhna, SuezAir LiquideSGG Equipment Erection2010
14 Sadat CityAir ProductsSphinx Glass- Air Separation Unit.E&I , Mechanical (Piping &Steel structure) Installation Works2010
156th of OctoberAir LiquideSILPA 140 Air Separation UnitTurn Key Job (Civil, E&I , Mechanical (Piping &Steel structure) installation works including pre commissioning and commissioning of the plant systems)220002009
16AlexandriaLinda - GermanyAir Separation PlantElectrical & Instrumentation Installation work.1995
17AlexandriaTechnifrigoChlorine Liquefaction PlantCivil, Mechanical , Sand Blasting & Painting , Hot\ Cold Insulation1994
18El-ArishTecnimontKTEMG-Gas compression station(Turnkey job) Electrical & Instrumentation Installation work , including pre-commissioning and commissioning activites .2011
19Alexandria, El-BrullusThyssen Krupp XervonEL-Brullus Compression Station.Electrical & Instrumentation Installation work , including pre-commissioning and commissioning activites .2009
20 AlarishKTIEMG-Gas Compression StationElectrical Work , including pre-commissioning and commissioning activites2008
21 AlarishKTIEMG-Gas Compression StationInstrument Installation , including pre-commissioning and commissioning activites2008
22IDKU – AlexBechtel overseas natural gas liquefaction com LNG. Plant Electrical & Instrumentation Installation work , including pre-commissioning and commissioning activites .2005
23SuezIcom Engineering - ItalyPlatform ReefersElectrical & Instrumentation Installation work , including pre-commissioning and commissioning activites .2002
24 CairoAEG/ALSTOM GermanyHeliopolis GIS 200/66/11 KvElectrical istallation , Equipment erection , cable tray installation , cable pulling , termination commissioning and start up .(GIS 200/66/11 kv)2001
25AlexandriaAEG/ALSTOM GermanyHeliopolis GIS 200/66/11 KvElectrical istallation , Equipment erection , cable tray installation , cable pulling , termination commissioning and start up .2001
26AlexandriaAEG/ALSTOM GermanyMidelec SubstationElectrical istallation , Equipment erection , cable tray installation , cable pulling , termination commissioning and start up .2000
27SuezCarlo GavazziSuez Steel PlantE & I ( cable tray installation ,cable pulling , termination commissioning and start up , Instrumentation Installation work ,including pre-commissioning and commissioning activites 2000
28AlexandriaTechnip ItalyNaphta Reformer ComplexElectrical & Instrumentation Installation work , including pre-commissioning and commissioning activites .Painting (150,000 M2) / Insulation. (45,000 M2)2000
29Alex national steel -Dekhela, AlexandriaSiemens - GermanySteel making /flat sheet plantsElectrical & Instrumentation Installation work , including pre-commissioning and commissioning activites .1999
30AlexandriaAEG/ALSTOM GermanyKarmoz 220/66Kv substationElectrical & Instrumentation Installation work , including pre-commissioning and commissioning activites .1999
31AlexandriaDSD-GermanyRod Mill Plant 750000ton/yearElectrical & Instrumentation Installation work , including pre-commissioning and commissioning activites .1997
32AlexandriaDSD-GermanyMain Lab.Electrical & Instrumentation Installation work , including pre-commissioning and commissioning activites .1995
33AlexandriaLinda - GermanyAir Separation PlantElectrical & Instrumentation Installation work , including pre-commissioning and commissioning activites .1995
34DamnhourNem - HollandDamnhour / mahmoudia power plantElectrical & Instrumentation Installation work , including pre-commissioning and commissioning activites .1994
35WepcoJacorossi- ItalyNAF PlatformElectrical & Instrumentation Installation work , including pre-commissioning and commissioning activites .1992
36Ex-C.S.I Borg El-Arab FactoryHassan Allam Mostakbal Misr ProjectFabrication & Painting of steel sections & Pipes14 Ton2023
37C.S.I Borg El-Arab FactoryHassan Allam
Construction
North Luxor ProjectFabrication & Painting of Steel Works for North Luxor Bridge Project223.6 Tons2022
38C.S.I Borg El-Arab FactoryHassan Allam
Construction
Al-Alamein Sheds ProjectFabrication & Painting of Steel Work for Al-Alamein Shed Project20.2 Tons2022
39C.S.I Borg El-Arab FactoryHassan Allam
Construction
Bashteel ProjectFabrication & Painting of Steel Work for Bashteel Project44.5 Tons2022
40FCA-C.S.I Borg El-Arab FactoryBoldrocchi Fabrication of No.6 Steel works for fan housing complete of No.6 inlet compensators + No.6 Outlet compensators + No.6 PedestalsSupply , Fabrication, painting , packing and delivery of No.6 fan housing + No.6 Inlet Compensators + No.6 Outlet Compensators + No.6 Pedestals 184.4 Tons2022
41C.S.I Borg El-Arab FactorySteel For Engineering Dubai internet city Supply, fabrication, hot-dip galvanizing & painting of stairs and handrails5 Tons 2021
42C.S.I Borg El-Arab FactoryBoldrocchi Fabrication of No.1 steel structures for aircooler Supply , Fabrication, painting , packing and delivery of No.1 Steel structure for Air coolers 5.5 Tons2021
43C.S.I Borg El-Arab FactoryHassan Allam
Construction
EMAAR BridgeFabrication and painting of Emaar brigde steel 128 Ton2021
44C.S.I Borg El-Arab FactoryBoldrocchi Bag filter fabrication-Buzzi Cement Plant (USA)Fabrication of No.1 steel structure relevant to Bag filter (Hoppers,casing,inlet dampers and covering structure)43 Ton2021
45C.S.I Borg El-Arab FactoryHassan Allam
Construction
SPHINX AIRPORT TERMINAL BUILDINGFabrication and painting of steel building 100 Ton2021
46Midor AlexandriaDgskie tradingTractor FactorySupply, Fabrication, Painting , Assembly , Erection , and Transportation of 4 crane girder to Midor site.6 Ton2020
47Toshiba FactoryDgskie tradingCrane Girders
(Toshiba Factory)
Supply, Fabrication, Sand blasting , Painting , and erection of double girders for 10 ton crane. 7 Ton2020
48C.S.I Borg El-Arab FactoryHassan Allam
Construction
Toshka Fabrication and , painting of Steel Pipes9.8 Ton2020
49C.S.I Borg El-Arab FactoryHassan Allam
Construction
El-Hadarat bridgeFabrication and painting of Steel Pipes50 Ton2020
50Fabrication , painting and assembly of steel beams 350 Ton2020
51C.S.I Borg El-Arab FactorySiemensSteel structure items Beni Suef power stationDesign , supply , fabrication and painting of steel structure Around 16,000 Kgs2019
52Faraskour EMCFire water tank "Faraskour El Wastany Company"Supply, prefabrication, welding, erection and hydrotesting of carbon steel water storage tank.Around 22,715 kgs 2019
53C.S.I Borg El-Arab FactoryBoldrocchiGas Capacity Increase Project "Algeria"Supply, Fabrication and , Inspection of No.6 Steel Structure & No.1 Rack of air cooler No.6 Steel Structure & No.1 Rack "74.8 Ton"2019
54C.S.I Borg El-Arab FactoryBoldrocchiZohr Development ProjectSupply, Fabrication, Inspection and Painting of No.4 Steel structure No.4 Steel Structure 52.6 Ton 2018
55MostorodGS E&CERC Refinery ProjectInstallation of steel structure St. St.: 2,967 Ton2018
56MostorodGS E&CERC Refinery ProjectPainting of steel structure St. St.: 2,967 Ton2018
57C.S.I Borg El-Arab FactoryAMCO/
Thermoengineering
Naphta Complex ProjectSupply, Fabrication, Inspection and Painting of Derrick legs and structural profiles7,300 Kgs of Derrick legs & 10,910 Kgs of Structural Profiles 2018
58C.S.I Borg El-Arab FactoryAMCO/
Thermoengineering
Naphta Complex ProjectSupply, Fabrication, Inspection and Painting of Vertical Ladders, Platforms, Hand-
rails and Gratings
7,585 Kgs of Ladders & Platforms
46 m² of Gratings (HDG
2018
59C.S.I Borg El-Arab FactoryAMCO/
Thermoengineering
Naphta Complex ProjectSupply, Fabrication, Inspection and Hot Dip Galvanization of Templates and Anchor Bolts74 Kgs of Templates & 219 Kgs of Anchor Bolts2018
60C.S.I Borg El-Arab FactoryAMCO/RESTA S.p.A.Zohr Development Project "Phase 2"Supply, Fabrication, Inspection and Painting of Vertical Ladders, Platforms, Hand-
rails and Gratings
15,100 Kgs of Ladders & Platforms
110 m² of Gratings (HDG)
2018
61C.S.I Borg El-Arab FactoryAMCO/
Thermoengineering
Zohr Development Project "Phase 2"Supply, Fabrication, Inspection, Hot Dip Galvanization and Painting of the Derrick Structural Components56,600 Kgs of Derrick Legs (Columns) and2018
62C.S.I Borg El-Arab FactoryAMCO/
HEMACO
Zohr Development Project "Phase 2"Supply, Fabrication, Inspection and Painting of Vertical Ladders, Platforms, Hand-
rails and Gratings
982 Kgs of Ladders & Platforms
6.75 m² of Gratings (HDG)
2018
63C.S.I Borg El-Arab FactoryTozzi / AmcoZohr Development ProjectSupply , fabrication and assembly of 4 salt binsaround 6 ton2017
64C.S.I Borg El-Arab FactoryKinetics Technology KtMATS ProjectDesign, Supply and fabrication of steel structurearound 40 Ton2017
65C.S.I Borg El-Arab FactoryBoldrocchiZohr Development ProjectSupply and fabrication of Steel Structures for Fin Fan Coolers of approximate weight of 36 Ton.36 Ton2017
66AlexandriaKinetics Technology KtMATS ProjectSupply, fabrication, installation and hydrotest of Molten Salt tank of stainless steel 321H 15 Ton2017
67AlexandriaThermo-Engineering / PetrobelZOHR Phase 1 ProjectSupply and fabrication of HP/LP/ LLP Flare Package65 Ton2017
68Ismalyia & DamiettaBoldrocchiAL-Shabab Power PlantSupply No. 3 Steel Structures for Fin Fan Coolers136 Ton2016
69C.S.I Borg El-Arab FactoryKinetics Technology KtZohr ProjectSupply and fabrication of no. 1,750 anchors with approximate weight of 10 ton. 1,750 anchor ≈ 10 ton2016
70 Bourg El-ArabCargill-NVOCDe-hulling Sandy Camel ProjectEquipment dismantle and erection and steel structure fabrication and erectionEquipment No.:592016
71C.S.I Borg El-Arab FactoryACCIONAStage 2, Phase 2 Gabal Al Asfar WWTP projectSupply and fabrication of Stainless steel wall pipes for pumping stations 2015
72C.S.I Borg El-Arab FactoryBoldrocchiHOLCIM HOGERS TOWN - KHD ProjectFabrication, Painting, galvanization and final preassembly of steel equipment (i.e. bag filter, By pass Filter and Heat Exchanger)230 Ton2015
73C.S.I Borg El-Arab FactoryBoldrocchiDelta Steel ProjectSupply Fabrication and painting of Carpentries and Fan housing 75 Ton2015
74IDKUELNGWaste Heat Recovery Unit Supply, Fabrication, Erection of St. Structure Works 270 Ton2014
75C.S.I Borg El-Arab FactoryBoldrocchiKiln & Raw Mill Existing Bag house ConversionFabrication and Painting and assembly of various steel equipment (i.e. Plenum, Hopper, casing, Filter house, Heat Exchanger… etc.)200 Ton2014
76Bourg El-ArabCargill-NVOCRoad Behind BG. 07Supply & Execution of Civil and Steel Works1,200 m22014
77C.S.I Borg El-Arab FactoryEthydCo.Derrick Structure and RiserFabrication of Derrick Structure and relevant flare riser including painting and galvanization work in addition to complete preassembly for fabricated Itemsaround 450 Tons 2014
78C.S.I Borg El-Arab FactoryMotridalAnchor BoltsSupply & Fabrication of Anchor Bolts2013
79C.S.I Borg El-Arab FactoryKahromikaSuez Thermal Power Plant STGSupply and Fabrication of Embedded Parts2013
80Borg El‐Arab Industrial ZoneTOTALTOTAL TEBUSupply, Fabrication, Painting, Insulation and Erection of Steel Structure, Pipe Rack and Equipment Steel Structure 108 Ton 2012
81AL- SoukhnaDANIELI DANIELI SMP site Suez EgyptModify Steel Pins2011
82C.S.I Borg El-Arab FactoryAMCO/
Thermoengineering
TE‐ENPPI/GPC‐ProjectSupply, Fabrication & Painting of Elevated Flare Package 2011
83C.S.I Borg El-Arab FactoryAMCOThermal OxidizerSupply & Fabrication and Painting of 1 Unit Thermal Oxidizer with its Ladders and Platforms2010
84C.S.I Borg El-Arab FactoryHassan AllamArabian cement company-ACC / RHI (reliance heavy industries).Supply & Fabrication of Belt Conveyor Parts, Silo and Chutes2010
85AlexandriaTechnip ItalyMIDOR DCU EXPANSIONDesign, Supply, Fabrication, Painting & Installation of Steel Structure and Anchor Bolts.2009
86Alexandria,Technip ItalyDCU EXPANSION PROJECTDetailed Engineering, Supply and Erection of Warehouse Building with Relevant Internal Office and Offices Building2009
87C.S.I Borg El-Arab FactoryEFJVCairo Metro Line 3Supply & Fabrication Of Steel Segments2008
88C.S.I Borg El-Arab FactoryELNGELNG - Plant IdkuSupply, Fabrication, Painting & Installation of A-Frame2008
89Bourg El-ArabCargill-NVOCNew Partitions / New Front Office / Gas Storage Civil and Steel Structure Work2008
90AlexandriaDAMIETTA LNG CONSTRUCTION LLCSun Shade for INCOESA Transformer Supply of Galvanized Steel Sections 2007
91C.S.I Borg El-Arab FactoryKahromikaPulp Dryer for Nubaria Sugar Factory 300 tonFabrication of Steel Equipment2007
92Cairo- Elgabal ElasfarDegremontWaste Water Treatment UnitFabrication & Installation of Piping & Steel Structure 2005
93C.S.I Borg El-Arab FactoryCarlo Gavazzi Midor Refinery Expansion ProjectINSTRUMENT SUPPORTS AND JUNCTION BOX FRAMES LOT 72 Tons2022
94C.S.I Borg El-Arab FactoryCarlo Gavazzi Midor Refinery Expansion ProjectINSTRUMENT SUPPORTS AND JUNCTION BOX FRAMES LOT 62.42 Tons2022
95C.S.I Borg El-Arab FactoryBoldrocchi Fabrication of Steel Works for Base FramesSupply, Fabrication, Painting and Machining of Motor Base Frames 9.25 Tons2022
96C.S.I Borg El-Arab FactoryCarlo Gavazzi Midor Refinery Expansion ProjectINSTRUMENT SUPPORTS AND JUNCTION BOX FRAMES LOT 56.193 Tons2021
97C.S.I Borg El-Arab FactoryCarlo Gavazzi Midor Refinery Expansion ProjectINSTRUMENT SUPPORTS AND JUNCTION BOX FRAMES LOT 425 Ton2021
98C.S.I Borg El-Arab FactoryCarlo Gavazzi Midor Refinery Expansion Project Supply of Instrument Supports for concrete floor LOT 34 Ton2021
99C.S.I Borg El-Arab FactoryCarlo Gavazzi Midor Refinery Expansion Project SUPPLY OF GALVANIZED SUPPORTS, JUNCTION BOX FRAMES LOT 114 Ton2021
100C.S.I Workshop-IDKUELNGAluminum Solar Cell SupportsSupply and Fabrication of Aluminum Solar Cells Supports2007
101C.S.I Borg El-Arab FactoryBoldrocchi Fabrication of No.1 Air intake + Compensators Supply , Fabrication, painting , packing and delivery for No.1 Air intake +compensators 18.824 Tons2022
102C.S.I Borg El-Arab FactoryBoldrocchi Fabrication of No.2 Air intakes for fans + No.4 Inlet compensators +No.4 Outlet compensatorsSupply , Fabrication, painting , packing and delivery of No. 2 air intakes 17.4 Tons2022
103C.S.I Borg El-Arab FactoryBoldrocchiDeir Azzour Project (Syria)Supply & Fabrication for N.2 Air Intake System340 Ton2016
104C.S.I Borg El-Arab FactoryBoldrocchi El Mahmoudia Power stationSupply & Fabrication for N.2 Air Intake System220 Ton2015
105C.S.I Borg El-Arab FactoryBoldrocchiN.2 Intake systems for GT AE94.2 6th October Extension P.PSupply & Fabrication for N.2 Air Intake System320 TON2014
106C.S.I Borg El-Arab FactoryAMCO/
Thermoengineering
Naphta Complex ProjectSupply, Fabrication and , Inspection of air duct8,300 Kgs of air duct 2018
107C.S.I Borg El-Arab FactoryBoldrocchiYamma cement plant in KSASupply, Fabrication and painting of set of ducts and miscellaneousaround 28 Ton2016
108C.S.I Borg El-Arab FactoryBoldrocchiN. 3 Bag Filters + DuctsSupply & Fabrication of air Ducts190 TON2013
109C.S.I Borg El-Arab FactoryDelta EngineeringInternal Painting of No.32 TanksSupply and application of painting for 32 tanks32 Tanks2022
110C.S.I Borg El-Arab FactoryEl Magd Warner LewisAL-ALAMAIN FUEL FARM PROJECTFABRICATION OF JET FUEL TANKS177.3 Tons2022
111C.S.I Borg El-Arab FactoryEl Magd Warner LewisSigma TankSupply and Fabrication of Tank18 Tons2021
112C.S.I Borg El-Arab FactoryOceanic Oil ServicesFabrication of Process TankSupply and Fabrication of Process Tank8 Ton2021
113Borg El‐Arab Industrial ZoneTOTALTOTAL TEBUTank FarmTanks (18 tank)2012
114 C.S.I Yard - AlarishKTI -HTIRaw & Fire water tankDesign, Supply, Fabrication, Installation, Sand Blasting & Painting of Raw & Fire Water Tank (2,285 Mt3)2007-02-01 00:00:002007
115C.S.I Borg El-Arab FactoryMidwater MIDOR WATER SUPPLY SYSETM RO WTP.Supply of No.1 Dual media filters No.1 DMF, No.1 Access platform2024
116C.S.I Borg El-Arab FactoryWTD/Midwater MIDOR WATER SUPPLY SYSETM RO WTP.Supply of No.3 Dual media filters No.3 DMF, No.1 Access platform2021
117FCA-C.S.I Borg El-Arab FactoryBoldrocchi Sinai Cement ProjectSupply , fabrication & painting of Bag Filter 58900 Kg 2024
118FCA-C.S.I Borg El-Arab FactoryBoldrocchi El-Gabon ProjectSupply, Fabrication, painting, and packing of complete Bag filter components and its Conditioning Towers420.88 Tons2023
119SuezBoldrocchiSUEZ Cement ProjectSupply, Fabrication of carpentries for new de-dusting system (bypass filter and plenum for cooler and Kiln/Raw Mill bag filters)130 Ton2017
120C.S.I Borg El-Arab FactoryBoldrocchiYamma cement plant in KSASupply, Fabrication and painting of No.2 mill bag filter, No.1 separator filter, set of ducts and miscellaneousaround 28 Ton2016
121C.S.I Borg El-Arab FactoryBoldrocchiN. 3 Bag Filters + DuctsSupply & Fabrication of N. 3 Bag Filters + Ducts190 TON2013
122West Nile Delta Carlo Gavazzi BP West Nile Delta Gas DevelopmentSand plastic and galvanization of Scaffolding Pipes15 Ton2023
123C.S.I Borg El-Arab FactorySiemensFabrication of No.5 Pipe Supports Supply, Fabrication & Painting of No.5 Pipe Supports Lot 2531.15 Kg2022
124C.S.I Borg El-Arab FactorySiemensFabrication of No.5 Pipe Supports Supply, Fabrication & Painting of No.5 Pipe Supports Lot 2531.15 Kg2022
125C.S.I Borg El-Arab FactorySiemensFabrication of No.5 Pipe SupportsSupply, Fabrication & Painting of No.5 Pipe Supports Lot 1531.15 Kg2021
126C.S.I Borg El-Arab FactoryWTD/Midwater MIDOR WATER SUPPLY SYSETM RO WTP.Electrical piping supports 1 Ton 1 Ton 2021
127C.S.I Borg El-Arab FactoryWTD/Midwater MIDOR WATER SUPPLY SYSETM RO WTP.Additional Piping supports 6 Ton 6 Ton 2021
128C.S.I Borg El-Arab FactoryWTD/Midwater MIDOR WATER SUPPLY SYSETM RO WTP.Structure , Skids , piping supports6 Ton 2021
129MostorodEnppiERC Refinery ProjectPerforming Welding & Piping work Welding of 6,022 joints 2019
130MostorodGS E&CERC Refinery ProjectFabrication and installation of piping work erection Piping: 46,000 DI2018
131MostorodGS E&CERC Refinery Project piping work Precommissioning Piping: 46,000 DI2018
132AlexandriaKinetics Technology KtMATS ProjectSupply and Installation of Insulation mateirals required for piping, Equipment and tank2500 sqm2017
133Borg El‐Arab Industrial ZoneTOTALTOTAL TEBUPiping Process and Facilities NetworksPiping 300 Ton2012
134CairoTermomeccanicaCairo West ProjectSupply of Pipes and Fittings2010
135Alexandria, Bourg El-ArabMAS EngineeringDelta Dying FactoryErection of Water Drainage Network (Piping Work)2009
136Damnhour ShabakatMahmoudia - Gas PipelinesNitrogen Purging and Drying of 6” gas line3 KM2009
137C.S.I Borg El-Arab FactoryUhde GmbHDifferent types of Pipe Supports / PDH-PP Plant - Port SaidSupply, Fabrication & painting for standard & special pipe supports both CS & SS 700 Ton 2009
138Bourg El-ArabMAS EngineeringFilmar Nile Textile Sewer Piping SystemFabrication and Installation Filmar Nile Textile Sewer System (Piping Work)2008
139C.S.I Borg El-Arab FactoryPetrofacWestern Desert Khalda (El-Salam Plant)Piping Prefabrication Works 60,000 DI2008
140 AlarishKTIEMG-Gas Compression StationCivil Works and Installation of Gas PipelinesPipeline = 1200 LM2008
141Libya TechnipPipline from Wafa desert to MellitahPipline 700 km inspection from Wafa desert to Mellitah on behalf of technip 20 Persons Supervision 2005
142Ex-C.S.I Borg El-Arab FactoryCarlo Gavazzi BP West Nile Delta Gas DevelopmentSand plasting and galvanization of Scaffolding acessories (double coupler and cup look ledger)15 Ton2023
143C.S.I Borg El-Arab FactoryDYPNFEmbedded PlatesPAINTING WORK1.35 Ton2021
144C.S.I Borg El-Arab FactorySiemensCooling tower Bypass stop logs & Guides -Beni Suef power station painting work4 sets of bypass stop logs and guids2019
145El-ArishTecnimontKTEMG-Gas compression station(Turnkey job) Painting and Insulation.2011
146C.S.I Borg El-Arab FactoryMI-SWACOSkid paintingSand Blasting and Painting work2011
147C.S.I Borg El-Arab FactoryMI-SWACO Centrifugal Short StandPainting of Short Stand Centrifugal2008
148AlarishKTI EMG-Gas Compression StationPainting Works.2008
149C.S.I Borg El-Arab FactoryLoTec, Inc. USA(4) FH Intake Systems Sand Blasting, Painting & Insulation work2007
150AlexandriaABBAcpaSand blasting & Painting work.2004
151 AlexandriaT.R.AsspcSand Blasting & Painting work.2004
152AlexandriaTechnip ItalyThiopaq Plant (AMOC)Painting & Insulation work2007
153AlexandriaTechnip ItalyNaphta Reformer Complex Painting & Insulation work.Painting (150,000 M2) / Insulation. (45,000 M2)2000
154Cairo Lurgi Rest ItalyIsomerization Plant Sand Blasting & Painting work.1998
155AlexandriaFWF/CgiLube Oil Expansion (AMOC)Hot / Cold Insulation work.2018
156Epco -AlexTechnip ItalyBoiler PlantInsulation work.(12,000 M2 )2018
157AlexandriaPetrojet - PirelliAlex TiresPainting work.10,000 M21995
158Ex-C.S.I Borg El-Arab FactoryHassan Allam El-Dabaa NuclearCutting Assembly, Welding, & finish of Embedded parts8 Ton2023
159C.S.I Borg El-Arab FactoryCarlo Gavazzi BP West Nile Delta Gas DevelopmentSupply , Fabrication of No.1 Loudspeaker Pole88 Kg2022
160C.S.I Borg El-Arab FactoryAMCOFlare Package for UTILITIES & OFFSITE FOR ASORC NAPHTHA COMPLEX PROJECT Repair of damaged parts 10 Ton2022
161C.S.I Borg El-Arab FactoryDYPNFEmbedded PlatesSUPPLY, FABRICATION AND DELIVERY OF EMBEDDED PLATES.1.35 Ton2021
162C.S.I Borg El-Arab FactoryAmco/MidorFlair Tips RepairWelding Repair for Flair Tips No.2 Flare Tips2020
163C.S.I Borg El-Arab FactorySiemensCooling tower Bypass stop logs & Guides -Beni Suef power station Supply, Fabrication of stop logs & guides4 sets of bypass stop logs and guids2019
164C.S.I Borg El-Arab FactoryBoldrocchiSuez El-Sokhna Plant
(Clinker Cooler Bag Filter)
Supply, fabrication transportation of loose materials 1798.7 Kg of HARDOX 450 & 121.9 Kg of S235 JR 2019
165SuezBoldrocchiSUEZ Cement ProjectRepair work and erection of carpentries for new de-dusting system130 Ton2017
166AlexandriaNamaa Engineering and TradingProcess Water Stripper ReboilerMechanical (Heat Exchanger Retubing)2012
167C.S.I Borg El-Arab FactoryRossetti MarinoENNPI Amer 8 Chemical Injection PackageFabrication & assembly of Chemical Injection Skid3500 Construction manhours2011
168El-ArishTecnimontKTEMG-Gas compression station(Turnkey job) Mechanical work2011
169C.S.I Borg El-Arab FactoryElite Parking Hydraulic Lifting Car MachineSupply and Fabrication of Hydraulic Lifting Car Machine2009
170C.S.I Borg El-Arab FactoryMI-SWACO Centrifugal Short StandSupply, Fabrication of Short Stand Centrifugal2008
171C.S.I Yard - 6th of OctoberChipsy for Food IndustriesLine 1, 2& 3 Seasoning MachineSupply, Fabrication & Installation2008
172C.S.I Borg El-Arab FactoryMI-SWACOPrefabricated AssembliesSupply and Fabrication2008
173C.S.I Borg El-Arab FactoryMI-SWACOMetal Covers & Sealed FlangesSupply and Fabrication2008
174AlarishKTI EMG-Gas Compression StationPre-Commissioning Activity and Assistance to Commissioning Activity 2008
175 AlarishKTIEMG-Gas Compression StationMechanical Works2008
176C.S.I Yard - 6th of OctoberChipsy for Food IndustriesWM Local BuiltSupply, Fabrication & Installation2007
177C.S.I Yard - 6th of OctoberChipsy for Food IndustriesConveyor Platforms Supply, Fabrication & Installation2007
178C.S.I Borg El-Arab FactoryLoTec, Inc. USA(4) FH Intake SystemsSupply, Fabrication work.2007
179DamiettaThyssen KruppMOBCOSupply of Galvanized C-Channel 80 2007
180Libya- TripoliBe-Six -BelgiumSahel & Sahara BankSupply, Fabrication & Installation of HVAC system2006
181C.S.I Yard - 6th of OctoberChipsy for Food IndustriesNew Line for Food ProcessingSupply, Fabrication & Installation2006
182AlexandriaADC - FranceCrane Girders Mechanical2004
183AlexandriaTechnip ItalyThiopaq Plant (AMOC)Mechanical, Rehabilitation, Start up, Operation & Maintenance Activities2004
184C.S.I Borg El-Arab FactoryAMCO/
Thermoengineering
Derrick Structure Supply and Fabrication work2002
185 AlexandriaEndico - EcoVarta Environment SystemMechanical2002
186Free Zone - AlexDaelimMiddle East Oil RefineryMechanical2001
187AlexandriaEPCOMain Drainage PitMechanical 1996
188AlexandriaTechnip ItalyNaphta Reformer ComplexMechanical WorksPainting (150,000 M2) / Insulation. (45,000 M2)2000
189Cairo Lurgi Rest ItalyIsomerization PlantMechanical Works1998
190AlexandriaESACOGas Pipe Line NetworkMechanical works (Pipeline Installation)Manhours=150,0001996
191AlexandriaTechnip ItalyMiddle East Oil RefineryMechanical (Piping)10,000 Di inch2000
192El-Alamine , EgyptEl-MarasemRotana HotelInstallation & testing of plumping & fire fighting package 2000 m piping with accessorices, plus firefighting package2023
193GUPCO - Port SaidABB TAURT and LTS 3 Test Ring to Calibrate Various Sizes of PSV2008
194GUPCO - Port SaidABB TAURT and LTS 3 Test Ring of instruments' calibration2008
1956th of OctoberMoody InternationalEl-Sharkia Tobacco Gas LineHydrostatic Test and The Pre-commissioning Activities of 12”/16”/24’’ Gas Line17.5 km2007
196NubariaMoody InternationalNubaria Sugar Factory Hydrostatic Test and The Pre-commissioning Activities of 8" Gas Line11 km2007
197IDKU – Alex/EMCELNGELNG. Plant Calibration of Valves InstrumentManhours =50002005
198C.S.I Borg El-Arab FactoryMidwater MIDOR WATER SUPPLY SYSETM RO WTP.Civil works2024
199El-Sadat City, MonufiaEGYMIFace Mask Production Line FactorySupply and Installation of Mask Factory BuildingOverall area 243.7 m22020
200El-ArishTecnimontKTEMG-Gas compression station(Turnkey job) Civil Work.2011
201El-Sokhna, SuezSaint GobainInside Manholes & Gas Reduction SlabCivil works "Storage Building"Manhours=140,0002010
202AlexandriaABB Gas Turbine Pilling WorksCivil workManhours=150,0002000
203AlexandriaEsacontra steelContra Steel FactoryCivil work1998
204Cairo - HeliopolisArab ContractorABB Head Quarter Building Civil work1998
205AlexandriaDSD-GermanyHigh Tolerance Concrete SlabsCivil works1997
206AlexandriaEPCOMain Drainage PitCivil works1996
207AlexandriaPetrojet - PirelliAlex TiresCivil works1995
208Midor AlexandriaDelta EngineeringMidor Refinery ExpansionManpower for Repair & Maintenance of Vessels and equipment 20 Persons2023
209Midor AlexandriaGBMMidor Refinery ExpansionManpower for Repair & Maintenance of Vessels and equipment 20 Persons2023
210Beni SueffSiemensBeni Sueff ProjectProvide service "Manpower Supply" to Beni Suief Project 272 Hr2022
211Beni SueffSeagullChange of Motor Fan Gear Box and InspectionManpower Supply for repair of 10 gear box units10 Gear Box units2022
212AlexandriaTechnimont KTTECHNIP IT -EP WORKS FOR MIDOR Manpower Supply10 Persons 2021
213SuezBoldrocchiSUEZ SOKHNA-PLANTMANPOWER AND EQUIPMENT SUPPLY20 Persons2017
214Al Arish / Egypt KTI star 30544/EMG EL‐Arish Gas Compression StationManpower Supply in all disciplines10 Persons 2008
215Kuwait TechnipTPL 2241 – OL2K ETHELYNE Project Manpower Supply in all disciplines10 Persons 2007
216Khurasania / KSA TechnipKHURSANIAH GAS PLANT, KINGDOM OF SAUDI ARABIA Manpower Supply in all disciplines10 Persons 2007
217Tripoli / Libya BesixBanque sahelo ‐ saharienne pour lʹinvestissement et lecommerce headquarters ‐ Tripoli Manpower Supply in all disciplines2006
218UAETechnip TPL 2137 cda 751/CUO 187 ‐ Unleaded gasoline / low sulphur gas plant Manpower Supply in all disciplines10 Persons 2005
219Mellitah / LibyaTechnipwestern Libya gas project ‐(Wafa coastal project ‐ Mellitah) Manpower supervision Supply in all disciplines on behalf technip20 Persons 2004
220EgyptAlstom Alex Cement Substation Manpower Supply in all disciplines2000
221Khurasaniah/KSA Technip ETHELYNE Project Manpower Supply in all disciplines10 Persons 2002
222Yanbu/KSATechnip ETHELYNE Project Manpower Supply in all disciplines10 Persons
223Ruwais/UAETechnip TPL 2137 cda 751/CUO 187 ‐Unleaded gasoline / low sulphur gas plant Manpower Supply in all disciplines10 Persons
224Kuwait Technip TPL 2241 – OL2K ETHELYNE Project Manpower Supply in all disciplines10 Persons
225Ras Laffan/Qatar Technip TPL 2158 CDA 751/CUO 187 ‐ Oryx GTL Limited Manpower Supply in all disciplines20 Persons
226Biskra/Algeria ABB NK1 SP3 Manpower Supply in all disciplines
227AlarishKTI EMGManpower Supply in all disciplines10 Persons