Pre-commissioning of 12”/16”/24’’ gas line
3 months
Moody International
16 KM.
Execute the hydrostatic tests and the pre-commissioning activities according to the required specs and the following scope of work:
1. Initial cleaning andPurging.
2. Water filling and venting.
3. Hydrostatic testing.
4. Bulk dewatering.
5. Final dewatering.
6. Final cleaning and initial drying (for complete pipeline length)
7. Final drying.
8. Nitrogen purging and packing to 1 bar (including supplying nitrogen)
9. Pneumatic air leak test before and after the hydrostatic test
10. Supplying all needed cleaning and gauging pigs required
11. Supplying water and water drainage.
12. Loading and unloading.
Pre-commissioning of 8″, gas line
2 months
Moody International
10 Km
Execute the hydrostatic tests and the pre-commissioning activities according to the required specs and the following scope of work:
1. Initial Cleaning and Purging
2. Water Filling and Venting
3. Air Leak Test
4. Hydrostatic Testing
5. Bulk Dewatering
6. Air Leak Test
7. Final Dewatering.
8. Final Cleaning and Initial Drying (for complete pipeline length)
9. Final Drying
10. Nitrogen Purging and Packing to 1 bar (Including Supplying Nitrogen)
11. Supplying all needed cleaning and gauging pigs required
TE/ENPPI – GPC Project
10 months
Thermoengineering.
Elevated flare package supply, fabrication & Painting.
Delta Dyeing Water Discharge Network
5 months
MAS Engineering
Supply, Fabrication, and Erection& Testing of drainage network
Hydraulic Lifting Car Parking Machine
26 months
Elite
Sheet metal & steel structure fabrication work.
ELNG Plant Idku
1 month
ELNG
240,000Mhrs
Supply, Fabrication & Installation of black steel. A-Frame
Middle East Oil Refinery (Midor)
7 months
Dailm
240,000Mhrs
Steam tracing and erection of two compressor unit including piping works.
Naphtha Isomerization Plant
5 months
LurgiResta
150,000Mhrs
Gas Pipe Lines Network
15 months
ESACO
120,000Mhrs
Chlorine Liquefaction Plant
11 months
Technifrigo
200,000Mhrs
Mechanical works.