Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the login-customizer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/icsiegy/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/icsiegy/public_html/wp-includes/functions.php on line 6114
CSI – Electrical Projects -Naphtha Reformer Complex

Quick contact info

At C.S.I – we pride ourselves on being a Service Oriented company that anticipates client requirements and our relationship with each of our clients is built on open communications, integrity and a continually striving to learn, gain amp; document experience and innovate.

icon_widget_image Saturday - Thursday : 9 AM to 4 PM; Friday: Closed icon_widget_image 10 Mostafa Maher Street, Glim, Alexandria, Egypt icon_widget_image +2 (0127) 49 59 327 Tele : +2 (03) 58 69 024
a

Naphtha Reformer Complex

Naphtha Reformer Complex

Clients

TECHNIP ITALY

Scope of work:

- Steel structure fabrication and installation, rotary machine installation
- Installation of vessels and towers.

Work volume:

900,000 Mhrs

Final Destination:

Alexandria

Year:

2000

Project Info