Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the login-customizer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/icsiegy/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/icsiegy/public_html/wp-includes/functions.php on line 6114
CSI – Mechanical Projects - Sphinx Glass Project (Air Separation Unit).

Quick contact info

At C.S.I – we pride ourselves on being a Service Oriented company that anticipates client requirements and our relationship with each of our clients is built on open communications, integrity and a continually striving to learn, gain amp; document experience and innovate.

icon_widget_image Saturday - Thursday : 9 AM to 4 PM; Friday: Closed icon_widget_image 10 Mostafa Maher Street, Glim, Alexandria, Egypt icon_widget_image +2 (0127) 49 59 327 Tele : +2 (03) 58 69 024
a

Sphinx Glass Project (Air Separation Unit).

Sphinx Glass Project (Air Separation Unit).

Client:

Air Products

Scope of work:

Electromechanical installations, pre-commissioning and commissioning, including supply of bulk materials of piping (CS & SS)
Mechanical installations include equipment erection, piping prefabrication, painting and erection, chemical cleaning, testing, pre-commissioning and commissioning.
Electrical work will be presented in the electrical references.
C.S.I award a safety performance certificate for achieving 100,000.00 safe working hours of this project.

Work volume:

100,000.0 Mhrs.