Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the login-customizer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/icsiegy/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/icsiegy/public_html/wp-includes/functions.php on line 6114
CSI – Mechanical Projects -Gas capacity increase project.

Quick contact info

At C.S.I – we pride ourselves on being a Service Oriented company that anticipates client requirements and our relationship with each of our clients is built on open communications, integrity and a continually striving to learn, gain amp; document experience and innovate.

icon_widget_image Saturday - Thursday : 9 AM to 4 PM; Friday: Closed icon_widget_image 10 Mostafa Maher Street, Glim, Alexandria, Egypt icon_widget_image +2 (0127) 49 59 327 Tele : +2 (03) 58 69 024
a

Gas capacity increase project.

Gas capacity increase project.

Client:

Boldrocchi

Scope of work:

Supply, Fabrication and, Inspection of No.6 Steel Structure & No.1 Rack of air cooler

Work volume:

74 Ton

Final Destination:

Algeria``

Year:

2019

Project Info